flag
Two other significant events have yet to our school, in which the investment must be resolved in our future. There, too, we want to show the flag. If
on 10/26/2010 from 16.00 the Committee on Finance days and participating in Haifa rooms and Mainz on 11/03/2010 from 15.00 the City Council in the Council Chamber of the Mainz city hall, we want to be represented by a delegation. We demonstrate impressively our interest in our school. Eight days before the respective meetings, the agenda at the above links will be published. Because the organization of delegations, we are in Einz again come to you. IS
Saturday, September 25, 2010
Watch Full Set Of P90x
show at last! 2011 is the new
Once before we were full of anticipation as we introduced the then head of the School Administration Office, Mr. Rausch during the school festival 2009, new plans for our school. It was But nothing, as everyone knows. Is similar to fear now? A very resounding no!
It was a long struggle of the school community and the distrust of the city was still low. Over 25 parents and teachers to wait so excited while maintaining the school committee meeting on Thursday, September 23, 2010 to the introduction of the new plans for our school.
These were presented jointly by Marianne Baudezernentin size and school department heads Kurt Mercator. But this was a real signal. because our case was declared not only verbally but also visible in both departments, a top priority. With high pressure in a very short Manage new, realistic plans created. That was not always so.
The reprogramming includes several stages and is future-oriented. The first section of the kitchen, the cafeteria and some classrooms built on the scruffy sports field. Estimated start of building shall be 2011. The new access road will be done by the Geschwister-Scholl-Straße in fact even during construction. This means that the current school operations can run smoothly realtiv further, while the new development high on the sports field is growing. The only drawback: We are at the sports lessons even more have to resort to other places.
But here comes the school administration, an idea from the school community and will try to allow us to use the adjacent sports grounds of the Bundeswehr.
After the completion of the first section, followed by sections 2 and 3, also on the sports field. Once these are completed, the move followed and the old, dilapidated buildings can be demolished. D-and E-building will remain, with the D-building is being renovated and will house the classrooms.
The current standing container on the sports field of the upper draw during the construction phase to the edge of the schoolyard between D and E buildings.
Further details are not yet known, both department heads said, however, for an appointment to present the plans in our school ready. The SEB will set targets for this with the administrator.
Conclusion
After the shock of the construction of Topps and a possible impending move, we see ourselves as SEB to now a city councilor duo that is obviously trying to make a quick and good solution. This became clear during the entire Schulträger Committee meeting. The parties represented in the committee voted unanimously for our expansion.
Here are the press article in the Allgemeine Zeitung newspaper and the Rhine as a PDF file (2MB)
Press article Neubau.pdf
Related Links
Read the online edition of the Allgemeine Zeitung Mainz the corresponding article
Once before we were full of anticipation as we introduced the then head of the School Administration Office, Mr. Rausch during the school festival 2009, new plans for our school. It was But nothing, as everyone knows. Is similar to fear now? A very resounding no!
It was a long struggle of the school community and the distrust of the city was still low. Over 25 parents and teachers to wait so excited while maintaining the school committee meeting on Thursday, September 23, 2010 to the introduction of the new plans for our school.
These were presented jointly by Marianne Baudezernentin size and school department heads Kurt Mercator. But this was a real signal. because our case was declared not only verbally but also visible in both departments, a top priority. With high pressure in a very short Manage new, realistic plans created. That was not always so.
The reprogramming includes several stages and is future-oriented. The first section of the kitchen, the cafeteria and some classrooms built on the scruffy sports field. Estimated start of building shall be 2011. The new access road will be done by the Geschwister-Scholl-Straße in fact even during construction. This means that the current school operations can run smoothly realtiv further, while the new development high on the sports field is growing. The only drawback: We are at the sports lessons even more have to resort to other places.
But here comes the school administration, an idea from the school community and will try to allow us to use the adjacent sports grounds of the Bundeswehr.
After the completion of the first section, followed by sections 2 and 3, also on the sports field. Once these are completed, the move followed and the old, dilapidated buildings can be demolished. D-and E-building will remain, with the D-building is being renovated and will house the classrooms.
The current standing container on the sports field of the upper draw during the construction phase to the edge of the schoolyard between D and E buildings.
Further details are not yet known, both department heads said, however, for an appointment to present the plans in our school ready. The SEB will set targets for this with the administrator.
Conclusion
After the shock of the construction of Topps and a possible impending move, we see ourselves as SEB to now a city councilor duo that is obviously trying to make a quick and good solution. This became clear during the entire Schulträger Committee meeting. The parties represented in the committee voted unanimously for our expansion.
Here are the press article in the Allgemeine Zeitung newspaper and the Rhine as a PDF file (2MB)
Press article Neubau.pdf
Related Links
Read the online edition of the Allgemeine Zeitung Mainz the corresponding article
Saturday, September 11, 2010
Hack Blue Tooth Adapter 360 Controller On Pc
move is off the table - is Anna Seghers IGS be converted in Mainz
On 11 September, we were able to breathe again. The redemptive message, see here in the online AZ.
On 11 September, we were able to breathe again. The redemptive message, see here in the online AZ.
Tuesday, September 7, 2010
Minnesota Tax Form Certificate Of Rent Paid
lack of space: IGS Anna Seghers urges quick solution
On 09/07/2010 the AZ reaches the issue again. Read the article here of 07/09/2010.
On 09/07/2010 the AZ reaches the issue again. Read the article here of 07/09/2010.
Saturday, September 4, 2010
Como Se Dice En Es Panol Sure You It Wrong
IGS decision in November
early September, features a solution slowly. Read the AZ message from 04.09.2010.
early September, features a solution slowly. Read the AZ message from 04.09.2010.
Subscribe to:
Comments (Atom)